SAP - Systems Applications and Products in Data Processing.
- SAP is an ERP Package.
- ERP stands for Enterprise Resource Planning.
- It Specifies the planning in all the departments in an organization. So the success of an organization will depends up on the planning in all the departments of particular organization(sales, finance, production, HR, etc) and that will be specified in SAP-ERP package.
- ERP specifies planning in 4 M's which are
- Money
- Materials
- Machinery
- Manpower
- The other ERP packages that are available in the market are:
- JD EDWARDS
- PEOPLE SOFT
- BAAN
- SEIBEL
- ORACLE
- MICROSOFT etc
Advantages of SAP:
- SAP will have solution for all the departments in an organization.
- SAP is tightly Integrated product i.e., if you do Transactions in one department it automatically updates that particular information in other departments where it is required.
Future of SAP:
- At present SAP Package hold 75% share in the market rest of the 25% will be shared by all other ERP Packages.
- There is no other package is available in the market as SAP. So if Some 'X' start implementing a competitor for SAP it will take around 10 years to finish. By then the will occupy above 80% of the market share. So, there will be no doubt on future of SAP to be the number one in the world.
- SAP is implemented in Germany in 1972 and there are 4 people involved in implementation of SAP.
- SAP is number one in world ERP processes.
From 3.0 -- ......--4.6 -- 4.6C -- 4.7 -- 5.0 -- 6.0 -- 7.0(Present)
- The difference between version to version is up-gradation of product.
- Based on the New requirement of clients SAP is coming out with new versions.
- SAP has stopped giving support up to 4.7 version. So the clients who are using those are version they need to upgrade their system to version 6.0.
- All the clients who are using SAP software will have to have life time support from implementation partner to solve their Tickets.
- In 6.0 version SAP is further released Enhancement package for the new requirements of clients.
EHP -- Enhancement Package.
Modules in SAP: There are two types of modules in SAP.
- Functional Modules (SD, FI, CO, MM, PP, QM etc)
- Technical Modules (BASIS, ABAP, NETWEAVER, etc)
ASAP METHODOLOGY
INTRODUCTION
Architecture of SAP:
The
architecture of SAP is R/3 i.e. Real Time 3 Tire architecture .The 3 layers are
1.
Presentation Layer
2.
Application Layer.
3.
Database Layer.
---- The system where user is working is
called as presentation layer
----Any
request generated from presentation layer will be sent to application layer.
----
The request will be sent to the database layer where the information is
searched and gives it back to the presentation layer.
Landscape:
Landscape is the arrangement of server and SAP
suggest going for three (3) servers’ i.e. any client who wants to implement SAP
they need to purchase these 3 servers.
The 3
servers are:
1. Development
Server
2.
Quality Server.
3.
Production Server (Live Server).
---
Development server will be used for configuring clients business process into
SAP i.e. consultants will do the configurations
---
Development server will be used by consultants
---
Quality server will be used for testing the scenarios
---
Quality server will used by consultants and core users (they are employee of
clients and well experienced person, has expose to the client’s business
process).
---
Production server will be used for entering day-to-day transactions in SAP.
---
Production server will be used by end users. Consultants i.e. we don’t have
access to production server.
Roles and Responsibilities of
Consultant:
As a
consultant we will be either placed into implementation project or support
project.
Implementation:
Configuring or mapping the client’s business process newly into SAP, who is
using some legacy system (legacy means Non-SAP).
Support: Any issues
raised by client will be solved by the consultant.
Roles and Responsibilities of Consultant
in Implementation Project:
Whenever
we want to implement SAP to any client we follow the methodology called ASAP
methodology where A means Accelerated SAP i.e. standard every company has to
follow ASAP Methodology.
ASAP
methodology consists of the guidelines to implement SAP i.e. step-by-step
process to implement SAP.
ASAP
methodology consists of 5 Phases.
- Project Preparation
- Business Blue Print
- Realization
- Final Preparation
- Go-Live and Support.
Project Preparation:
Whenever we receive order from client to implement SAP, then we start project
preparation phase in the project preparation phase the management from
implementation partner (ex IBM), the management from client (ex ALKEM) will
involve.
Activities in Project preparation:
- User Licenses
- Landscape
- Infrastructure.
Any
client wants to implement SAP they need to purchase user licenses from SAP and
based on the end-users the client will come to know how many user licenses to
be purchased from SAP
End User: End user is the employee of client who will
do day-to-day transactions in SAP and there is no sharing of licenses between
users.
Each
user licenses costs 80000 Rs.
Landscape: It
is an arrangement of server and SAP suggests going for 3 server’s .In this
configuration of server i.e. storage capacity must be taken care.
Infrastructure:
1. How
many new pc’s i.e. systems to be purchased
2. Server
environment i.e. temp requirement, separate room, security
Servers
will always kept at clients plant i.e. mostly at any one of the manufacturing
plant
If
the head office and manufacturing plant are at different places then through
VPN (Virtual Private Network) the data will be accessed.
The
implementation partner will list out all the consultants who are going to
involve in the project.
The
clients will list out all the core users who are going to involve in the
project.
For
Unknown client the implementation team size will be 15 members (domestic
client), and if unknown foreign clients the team size will be 40.
Throughout
the implementation project the single point of contact for the consultant is
core user
Consultants Facilities:
1.
Accommodation 2. Food Expenses
3.
Local Travelling 4. Work Environment
5.
Laptops
Go-Live Date:
Go-Live
is handling over SAP to client i.e. from that day onwards client will start
entering day-to-day live transactions in SAP
The
management people will fix the Go-Live date
After
completion of project preparation phase the implementation partner management
will come back to office and conduct Kick-Off meeting (starting off) in the
Kick-off meeting they will invite all the consultants who are involved in the
project.
In
the Kick-Off meeting the following will be discussed
1.
Introduction to client
2.
Rules and Regulations of clients
3.
Roles and Responsibilities of consultants
4.
Shares core user’s information
5.
Go-Live Date
6.
When to start the project i.e. Starting Date
Business Blue Print:
When
all the consultants move to clients place then we start business blue print
phase.
On
the first day of clients visit, first half we will have introduction,2nd
half they will take for site visit
Activities:
We
gather the client’s requirements from core user’s .Based on the questioner
provided by the implementation partner we gather the requirements from core
users .Every day we go to core users place and ask the questions in sequence,
note down whatever the core user is explaining .Every day after completion of
requirements gathering we come back to our place and prepare As-Is document.
As-Is document
consists of the present business process of the clients i.e. whatever core
users explains.
The
tenure for requirements gathering is 2 months
After
completion of requirement gathering we prepare business blue print document.
Business
blue print document consists of AS-IS and To-Be
To-Be
is how it is going to be in SAP. While preparing To-Be process we may find some
gaps.
Gap: The present
business process of the client for which there is no solution in SAP.
Whenever
we find gap we prepare Gap Analysis Document which consists of
1.
Description of client’s business process
2.
Alternate solution
3.
Effort (how many days, functional man days, technical man days).
After
preparing business blue print .We will send this document to care users for
Sign-Off i.e. for conformation. Core user has to go through the document if
everything is fine he will give you sign-off
After
getting sign-off from core user we need to move to the next phase of ASAP
methodology i.e. Realization.
BBP
document preparation and sign off will take 1 ½ month and total BBP phase will
take 3 ½ months.
Throughout
the implementation project the most critical phase is BBP because the success
of the project is totally depended on how accurate we gather the requirements
from core user.
After
gathering the BBP conformation mail from core user we will prepare one more
document called BBP sign-Off document .The reason of Sign-Off is if core user
is saying/asking some other requirements at the time of Go-Live then we will
show this Sign-Off form.
After
Sign-Off we will move to the next phase of ASAP methodology.
Realization: Configuring
the client’s business process in SAP or mapping the process in SAP. Mapping To-Be process in SAP. In this phase
we enter into development server to configure the client’s business process.
We
have 2 types of configurations
1.
Base Line Configuration
2.
Final Configuration.
Base
Line Configuration is the configuration for which no need to depend on other
module consultants. (It is a configuration which is specific to one module)
Final
configuration is the configuration for which we need to depend on other module
consultants.
Whatever
we configure while saving system will ask for request number. We need to save
the configuration in a particular number. Request number will help to transport
the configuration from one server to another server.
After
completion of base line configuration and final configuration we transport the
entire request from development server to quality server.
Consultants Role in Transporting
Request:
We
need to release all the request each request consists of parent and child first release the child request and the release
the parent request then list out all the request numbers in excel file along
with description and sequence and send
the excel file to basics consultant.
Basics
consultant will actually transport the request from one server to another
server.
Transporting
request is of 2 types
1. Customizing
request
2. Work
bench request
Customizing request:
Whatever functional consultant will do that will be saved in customizing
request.
Work bench request:
Whatever technical consultant will do i.e. ABAPER that will be stored in work
bench request
After
completion of configuration we transport the entire request from development
server to quality server .After transporting the request we will do testing in
quality server.
Testing
is of two types --Unit testing
--Integration testing.
1.
Unit Testing: It is the
testing for which we need not depend on other module consultant
2.
Integration Testing: It is
the testing for which you need to depend on other module consultant.
Before
testing we need to prepare a test case document which includes
- What to test
- How to test
- Expected result
- Actual result
- Status
- Tested documents no
During
final configuration we prepare functional specification document i.e. whenever
we require the help of ABAPERS we will prepare functional specification
document.
After
testing we will prepare
1.
User Manuals Document
2.
Configuration Document
User Manuals Document: This
will have step-by-step process of creating Master Data and Transaction Data
along with the screen shots.
This
document will help the end-user
Configuration Document: Whatever we
configure we will put in a document along with the screen shots .Configuration
document will help for K.T purpose i.e. (Knowledge Transfer).
After
preparing the entire document we move to next phase of ASAP methodology i.e.
Final Preparation.
Final Preparation:
Activities
1.
Training to core users
2.
After training we will ask for users to test the scenarios .e core users will
test all the scenarios and if everything is fine the core users will give UAT
sign off (User Acceptance Test).
3.
After getting UAT sign off we transport all the request from quality server to
production server.
4.
After transporting the request to production server we do” Cut-Over Activities”
Cut
over activities is the uploading of master data and open transaction data from
legacy to SAP.
Consultants Role in Cut over Activities:
Consultants
will do recording and simultaneously prepare excel file and sends the recording
to ABAPER excel file to core user.
Based
on recording ABAPER will develop BDC Batch Data Communication program and gives
it to consultant.
Core
User will fill the data in excel file and gives it to consultant.
After
we do mock run in quality server and if everything is fine we upload the data in
production server.
Any
transaction if it is invoice to customer we don’t upload that transactions.
After
transaction i.e. uploading the data from legacy to SAP we move to the next
phase of ASAP methodology i.e. Go Live and Support”.
Go –Live: It is the date
from which client will start entering day-to-day transaction in SAP.
Any
implementation after go-live we will give 3 months of post production support.
Support Project: Solving
the issues raised by the client who already implemented SAP.
Whenever
any new support project comes there is an agreement between both the parties
i.e. SLA (Service Level Agreement). As a consultant we should know some
information from SLA.
1. Priority of Issues or Ticket:
Generally
the tickets will be classified into 3 levels
1.
High Priority.
2.
Medium Priority
3.
Low Priority.
High
Priority: Any Issue raised by the client and if it is stopping the
client’s business process then we treat it as high priority issue.
Any
issues in deliveries and invoice will be treated as high priority issues
because it will stop the client’s business process.
High
priority issues should be solved within 4 hours, M.P.I in 24 hours, L.P.I in 48
hours.
2. Change Request: Anything
client is asking for which there is no present configuration then we treat it
as change request .Change request will not be considered as priority of issues,
we need to prepare change request document which includes --- issue
description
--- expected
solutions
--- Estimated effort
After
preparing the document we will send this to our superior for review then we
will send the document to core user for approval. After approval we need to
start working on the issue. Whenever we get new support project they will
conduct kick – off meeting and they will invite all the consultants who are
going to involve in the project, the normal team size for unknown client
support project is 12.
Kick
off means starting off, after kick off meeting all the consultants will move to
the clients place for K.T purpose.
K.T Process: Core
users will hand over configuration documents to the consultants .consultants
has to go through the configuration document and simultaneously do the system
study .After the system study consultant has to prepare understanding document
and then consultant has to give reverse K.T to the coursers .After reverse K.T
the consultants will come back and start supporting the client.
Ticket Cycle:
First
end-user will get the error while doing transactions in SAP, once end-user gets
the error he will send mail to help desk .In help desk we will find coursers
will try first to solve the issue, if it is not in his hand then he will place
the ticket in ticketing tool.
The
ticketing tool available in the market is remedy, peridran, citric, solution
manager. While placing the ticket in the ticketing tool core user will mention
the priority of the ticket.
After
placing the ticket in, a mail will be sent to support partner’s coordinator.
Coordinator will open the ticketing tool and allocate it to the relevant
consultant.
After allocating the ticket mail will be sent
to the consultant, consultant will open the ticketing tool.
The
basic responsibility of the consultant once we receive the ticket we need to
send an acknowledgement to users within 10 minutes. We need to send the
acknowledgement to both core users and end users and cc to coordinators.
Status of the Ticket:
1.
Open.
2.
Work in progress.
3.
Waiting for information
4.
Waiting for conformation
5.
Testing.
If
the status is work in progress then only the clock starts, other than that the
clock will stop.
After
analyzing the ticket raised by core user we go to the preproduction server and
try to do the same what end-user is doing in production server .Because
production server is mirror image of production server, we will also get error
in preproduction server, then we will analyze the error and go to development
server and do the necessary configurations and send the request number to
quality server and ask the core user to test it and conform.
After
getting conformation we will transport the request from quality to production,
change the status of issue to close.
Manually
we need to maintain issues in an excel file. Whenever we solve any ticket we
need to prepare a document called issue resolution document.
Issue
resolution document consists of
1.
Ticket number
2.
Date.
3.
Description.
4.
Solutions.
5.
Consultants Name.
This
document will help for future enhancement.
Levels in Support:
If
the support team size is more than 60 then only we will have levels in support
team
They
are normally classified into three levels:
1.
Level-1(works on high priority issue)
2.
Level-2(configuration (medium\low))
3. Level-3(Change request).
In
support any ticket if there is no solution in from configuration side the we
post the ticket to SAP.
Product
or production error comes only when we update the system from one version to
another.
Consultants Role in Weekly Meeting:
We
need to prepare excel with the list of issues which is having the status begin
or open i.e. not yet closed and we carry this excel file to weekly meeting and
we discuss the issues one by one with the project manager or project lead.
When
we enter into SAP the default screen is SAP Easy access.
End
user will work on easy access screen, end user is the employee if clients who
will do day to day transactions in Sap.
Consultants
will work on IMG screen (implementation guide)
Enter
SPRO tcode in tcode bar and click on SAP Reference IMG.
If
you are in other screen than easy access then we need to put either /n or o
before tcode.
/n
means it overwrites the present screen
/o
means it opens a new session.
1
Company Code: A company code is an organizational unit which
is responsible for all external financial transactions which happens in the
company (external financial transactions are balance sheet, profit and loss
statements.
A
company code is an organizational unit which is registered under company’s act
`1956.
FI
consultants are responsible to define company code in SAP.
Every
organization units will be defined in SAP as code. Company code is a four (4)
digit code. A company code is a physical entity.
2.
Sales Organization: It is an organizational unit which is
responsible for all sales and services happens in the company. It is an organizational
unit where strategic decisions related to sales will be taken. It is a
organizational unit where you find director sales and vice president sales.
SD
consultant is responsible to define sales organization in SAP.
Sales
organization is a 4 digit code. Sales .It is a physical entity i.e. which will
have address.
In
what scenarios client will have multiple organizations
1.
Multiple company codes
2.
Bifurcation of sales responsibilities based on geographical locations
3.
Domestic and exports
In
our project we have 2 sales organizations
1.
Domestic 2. Export
3. Distribution Channel:
It is the way of selling the goods to customers or it is the way of
distributing the good to the customers
In
our project we have 4 Distribution channels
1.
Dealers 2. Distributors
3.
Direct 4. Institution
The
combination of sales organization and distribution channel is called sales
line.
SD
consultant is responsible to define distribution channel in SAP. The
distribution channel is 2 digit codes.
4. Division:
Division is the range of products or product line. Grouping of materials which
are similar in nature.
example
1.
Gynecology 2. Pediatric
3.
Insulin 4. Cardiology
5.
Orthopedic 6. Antibiotic
A
division is a two digit code .SD consultant is responsible to define division
in SAP.
The
combination of sales organization, distribution channel and division is called
as sales area.
In
SAP-SD sales area plays a vital role. Whatever transaction we do in sales it
should be related through particular sales area.
Distribution
channel and division is logical unit because they don’t have address.
5. Sales Office:
It
is a physical location where group of people will work together to perform
sales .The length of sales office is 4 digit.SD consultant is responsible to
define sales office in SAP.
6.
Sales
Group: Sales group is a group of people
working in a sales office and working for different activities. In our project
we have 2 groups
1. Insulin
2. Antibiotic
The length of sales group is 3 digit code.SD
consultants is responsible to define sales group.
8.
Depo: Depo is a place where we store finished
goods fort easy distribution of goods to customers.
9.
Storage Location: It is a physical
location where we store the goods within a plant.
Carry and Forward:
If the depo is owned by the company we call it as
depo.
If the depo is owned by third party person then we
call it as CNF.
MM consultant is responsible to define plant in
SAP. A plant is a 4 digit code.
In our project we have 2 manufacturing plants, 27
depos.
Each plant will have 5 storage locations
1. Raw material.
2. Semi finished goods.
3. Finished Goods1.
4. Finished Goods2.
5. Returns
MM
consultant is responsible to define storage location in SAP. Storage location
is a 4 digit code.
10. Shipping Point: It
is a physical location where we do the process of loading the goods into
trucks, for dispatching it to customers.
In
our project each plant we have 2 shipping points
1.
Manual shipping point.
2.
Automatic shipping point.
SD
consultant is responsible to define shipping point .Shipping point is a 4 digit
code.
COMPANY:
Company is an organizational unit which
will group several company codes into one.
FI
consultant is responsible for company.
BUSINESS AREA: It
is an organizational unit which will help to generate internal balance sheet
plant wise. FI consultant is responsible for business area.
CREDIT CONTROL AREA: It
is an organizational unit which specifies group of people responsible for
credit activities .FI consultant is responsible for this activity.
CONROLLING AREA: It
specifies the group of people responsible for product costing activities.CO
consultant is responsible to define controlling area.
Defining Company Code
in SAP:
A
company is a 4 digit code
Path:
Enter
SPRO tcode in code bar
Enterprise
structure →
Definition →Financial
accounting →
edit, copy, delete, check company code and click on IMG activity double click
on edit company code data.
Select
the standard company code 1000 and click on copy as symbol after copy change
the code.
After
entering the details click on copy then save it.
When
we will save the system will ask the request number.
And
click on continue.
Defining Sales
Organization:
SD
consultant is responsible to define sales organization.
Path:
spro →
enterprise structure →
definition→sales
and distribution →define
copy delete sales organization ,double click on define sales organization.
Select
standard sales organization 1000 and click on copy as.
Define
Distribution channel in SAP:
Spro →
enterprise structure →
definition →
sales and distribution →
define copy delete check distribution channel, double click on define
distribution channel new entries, create distribution channel.
Define Division:
Path:
Spro →
enterprise structure →
definition→logistic
general →define
copy check delete division.
Double
click on define division
New
entries
Define Sales Office:
Path:
Spro →
enterprise structure →
definition →
sales and distribution → maintain
sales office.
No comments:
Post a Comment